• About
  • Advertise
  • Privacy & Policy
  • Contact
Monday, November 9, 2026
Anambra people magazine
  • Home
  • POLITICS
  • GENERAL
  • CRIME
  • ANAMBRA TV
  • EDUCATION
  • BUSINESS
  • ENTERTAINMENT
  • EVENTS
  • ANAMBRA @30
  • DIASPORA
  • Sports
No Result
View All Result
  • Home
  • POLITICS
  • GENERAL
  • CRIME
  • ANAMBRA TV
  • EDUCATION
  • BUSINESS
  • ENTERTAINMENT
  • EVENTS
  • ANAMBRA @30
  • DIASPORA
  • Sports
No Result
View All Result
Anambra people magazine
No Result
View All Result
Home GENERAL

National grid restoration commences hours after TUC, NLC suspends strike

Onyeka by Onyeka
June 4, 2024
in GENERAL
POWER; CD Attribute Collapse of National Grid To Corruption, Lack of Leadership, Wants DISCOs Licenses Revoked
Share on FacebookShare on TwitterShare on Whatsapp

The Transmission Company of Nigeria has said it has begun the restoration of the National grid to restore electricity supply hours after the Nigeria Labour Congress and Trade Union Congress suspended its indefinite strike.

This comes after the organised labour suspended its strike action for one week following renewed commitment from the federal government.

Following the strike suspension, TCN said power recovery has begun with the Shiroro Hydropower Substation which will then restore supply to Katampe substation.

TCN in a statement on Monday confirmed that the nationwide blackout was caused by the organized Labour’s planned strike.

“At about 3.23am, however, TCN commenced grid recovery, using the Shiroro Substation to attempt to feed the transmission lines supplying bulk electricity to the Katampe Transmission Substation.

RelatedPosts

Jubilation as Navy breaks 50years water scarcity jinx, commissions solar powered borehole in Anambra community

Anambra to establish menstrual health mgt

3-storey building for demolition In Anambra community

The situation is such that the labour Union is still obstructing grid recovery nationwide.

“We will continue to make efforts to recover and stabilize the grid to enable the restoration of normal bulk transmission of electricity to distribution load centres nationwide”, TCN stated on Monday.

Recall that the organized labour on Monday shut down the country’s National grid to press home their demand for a new minimum wage implementation.

However, at the time of filing the report, the power supply is yet to be restored by Electricity Distribution Companies.

About Author

Onyeka

See author's posts

    Previous Post

    Adaora Soludo Becomes A Member Of APGA (Photos)

    Next Post

    Group urges Soludo to sign ANSIEC Bill into law

    Onyeka

    Onyeka

    Next Post
    ANSEC Awards Contract For Construction Of Specialist Hospital At FEGGE And General Hospital, Oroma Etiti

    Group urges Soludo to sign ANSIEC Bill into law

    Recent News

    Tinubu Will Release Nnamdi Kanu – Bianca Ojukwu

    Bianca Ojukwu Gets New Appointment

    November 8, 2026
    “A Divine Victory”: Senator Umeh credits God for triumph in 2023 election and tribunal

    Soludo’s support for Tinubu’s reelection is because he can’t feel pains of Nigerians – Umeh

    November 8, 2026
    Catholic group plans to build hospital for free healthcare in Anambra 

    Catholic group plans to build hospital for free healthcare in Anambra 

    November 8, 2026
    “This is the President that loves Ndi Igbo”, Soludo says, as APGA flags off campaign

    “This is the President that loves Ndi Igbo”, Soludo says, as APGA flags off campaign

    November 8, 2026

    Most Read

    No Content Available

    Copyright © ANAMBRA PEOPLE MAGAZINE. All rights reserved.

    No Result
    View All Result
    • Home
    • POLITICS
    • GENERAL
    • CRIME
    • ANAMBRA TV
    • EDUCATION
    • BUSINESS
    • ENTERTAINMENT
    • EVENTS
    • ANAMBRA @30
    • DIASPORA
    • Sports

    © wordpress-1211428-4405999.cloudwaysapps.com