• About
  • Advertise
  • Privacy & Policy
  • Contact
Saturday, February 21, 2026
Anambra people magazine
  • Home
  • POLITICS
  • GENERAL
  • CRIME
  • ANAMBRA TV
  • EDUCATION
  • BUSINESS
  • ENTERTAINMENT
  • EVENTS
  • ANAMBRA @30
  • DIASPORA
  • Sports
No Result
View All Result
  • Home
  • POLITICS
  • GENERAL
  • CRIME
  • ANAMBRA TV
  • EDUCATION
  • BUSINESS
  • ENTERTAINMENT
  • EVENTS
  • ANAMBRA @30
  • DIASPORA
  • Sports
No Result
View All Result
Anambra people magazine
No Result
View All Result
Home GENERAL

National grid restoration commences hours after TUC, NLC suspends strike

Onyeka by Onyeka
June 4, 2024
in GENERAL
POWER; CD Attribute Collapse of National Grid To Corruption, Lack of Leadership, Wants DISCOs Licenses Revoked
Share on FacebookShare on TwitterShare on Whatsapp

The Transmission Company of Nigeria has said it has begun the restoration of the National grid to restore electricity supply hours after the Nigeria Labour Congress and Trade Union Congress suspended its indefinite strike.

This comes after the organised labour suspended its strike action for one week following renewed commitment from the federal government.

Following the strike suspension, TCN said power recovery has begun with the Shiroro Hydropower Substation which will then restore supply to Katampe substation.

TCN in a statement on Monday confirmed that the nationwide blackout was caused by the organized Labour’s planned strike.

“At about 3.23am, however, TCN commenced grid recovery, using the Shiroro Substation to attempt to feed the transmission lines supplying bulk electricity to the Katampe Transmission Substation.

RelatedPosts

Billionaire Oil Mogul, Arthur Eze Loses Brother

First Power Electricity Appoints Anambra Journalist, Izunna Okafor, as Head of Communications

Group pledges N10m for surgery of 6 year-old brain tumour patient in Anambra

The situation is such that the labour Union is still obstructing grid recovery nationwide.

“We will continue to make efforts to recover and stabilize the grid to enable the restoration of normal bulk transmission of electricity to distribution load centres nationwide”, TCN stated on Monday.

Recall that the organized labour on Monday shut down the country’s National grid to press home their demand for a new minimum wage implementation.

However, at the time of filing the report, the power supply is yet to be restored by Electricity Distribution Companies.

About Author

Onyeka

See author's posts

    Previous Post

    Adaora Soludo Becomes A Member Of APGA (Photos)

    Next Post

    Group urges Soludo to sign ANSIEC Bill into law

    Onyeka

    Onyeka

    Next Post
    ANSEC Awards Contract For Construction Of Specialist Hospital At FEGGE And General Hospital, Oroma Etiti

    Group urges Soludo to sign ANSIEC Bill into law

    Recent News

    Billionaire Chico, 5 Others Get Certificate of Recognition as Anambra monarchs

    Billionaire Chico, 5 Others Get Certificate of Recognition as Anambra monarchs

    February 20, 2026
    Senator Umeh Completes 1.2 Kilometer Road Project

    Senator Umeh Completes 1.2 Kilometer Road Project

    February 20, 2026
    Bank of Industry Hands over 30-room hostel to UNIZIK 

    Bank of Industry Hands over 30-room hostel to UNIZIK 

    February 20, 2026
    Anambra Entrepreneur Unveils Voomrecruit Platform for Job Seekers

    Anambra Entrepreneur Unveils Voomrecruit Platform for Job Seekers

    February 20, 2026

    Most Read

    No Content Available

    Copyright © ANAMBRA PEOPLE MAGAZINE. All rights reserved.

    No Result
    View All Result
    • Home
    • POLITICS
    • GENERAL
    • CRIME
    • ANAMBRA TV
    • EDUCATION
    • BUSINESS
    • ENTERTAINMENT
    • EVENTS
    • ANAMBRA @30
    • DIASPORA
    • Sports

    © wordpress-1211428-4405999.cloudwaysapps.com