• About
  • Advertise
  • Privacy & Policy
  • Contact
Wednesday, August 12, 2026
Anambra people magazine
  • Home
  • POLITICS
  • GENERAL
  • CRIME
  • ANAMBRA TV
  • EDUCATION
  • BUSINESS
  • ENTERTAINMENT
  • EVENTS
  • ANAMBRA @30
  • DIASPORA
  • Sports
No Result
View All Result
  • Home
  • POLITICS
  • GENERAL
  • CRIME
  • ANAMBRA TV
  • EDUCATION
  • BUSINESS
  • ENTERTAINMENT
  • EVENTS
  • ANAMBRA @30
  • DIASPORA
  • Sports
No Result
View All Result
Anambra people magazine
No Result
View All Result
Home GENERAL

National grid restoration commences hours after TUC, NLC suspends strike

Onyeka by Onyeka
June 4, 2024
in GENERAL
POWER; CD Attribute Collapse of National Grid To Corruption, Lack of Leadership, Wants DISCOs Licenses Revoked
Share on FacebookShare on TwitterShare on Whatsapp

The Transmission Company of Nigeria has said it has begun the restoration of the National grid to restore electricity supply hours after the Nigeria Labour Congress and Trade Union Congress suspended its indefinite strike.

This comes after the organised labour suspended its strike action for one week following renewed commitment from the federal government.

Following the strike suspension, TCN said power recovery has begun with the Shiroro Hydropower Substation which will then restore supply to Katampe substation.

TCN in a statement on Monday confirmed that the nationwide blackout was caused by the organized Labour’s planned strike.

“At about 3.23am, however, TCN commenced grid recovery, using the Shiroro Substation to attempt to feed the transmission lines supplying bulk electricity to the Katampe Transmission Substation.

RelatedPosts

Ebube Muonso celebrates 15 years of priesthood, highlights scholarships, medical, humanitarian interventions

Land, leadership disputes deepen in Anambra community

Okoluche Residents at Ikenga Ogidi decry Loss of Lives, Kidnapping, Flooding

The situation is such that the labour Union is still obstructing grid recovery nationwide.

“We will continue to make efforts to recover and stabilize the grid to enable the restoration of normal bulk transmission of electricity to distribution load centres nationwide”, TCN stated on Monday.

Recall that the organized labour on Monday shut down the country’s National grid to press home their demand for a new minimum wage implementation.

However, at the time of filing the report, the power supply is yet to be restored by Electricity Distribution Companies.

About Author

Onyeka

See author's posts

Previous Post

Adaora Soludo Becomes A Member Of APGA (Photos)

Next Post

Group urges Soludo to sign ANSIEC Bill into law

Onyeka

Onyeka

Next Post
ANSEC Awards Contract For Construction Of Specialist Hospital At FEGGE And General Hospital, Oroma Etiti

Group urges Soludo to sign ANSIEC Bill into law

Recent News

Services and inquiries about Anambra State are now a click away

Services and inquiries about Anambra State are now a click away

August 11, 2026
Police raid criminal hideouts, arrest 2, recover drugs worth ₦6.2m, ₦598,400 cash

Police raid criminal hideouts, arrest 2, recover drugs worth ₦6.2m, ₦598,400 cash

August 11, 2026
NSE, Zobis Cables Forge Partnership to Empower Engineers, Advance Indigenous Industrial Capacity

NSE, Zobis Cables Forge Partnership to Empower Engineers, Advance Indigenous Industrial Capacity

August 11, 2026
Ebube Muonso celebrates 15 years of priesthood, highlights scholarships, medical, humanitarian interventions

Ebube Muonso celebrates 15 years of priesthood, highlights scholarships, medical, humanitarian interventions

August 11, 2026

Most Read

No Content Available

Copyright © ANAMBRA PEOPLE MAGAZINE. All rights reserved.

No Result
View All Result
  • Home
  • POLITICS
  • GENERAL
  • CRIME
  • ANAMBRA TV
  • EDUCATION
  • BUSINESS
  • ENTERTAINMENT
  • EVENTS
  • ANAMBRA @30
  • DIASPORA
  • Sports

© wordpress-1211428-4405999.cloudwaysapps.com