• About
  • Advertise
  • Privacy & Policy
  • Contact
Saturday, June 14, 2025
Anambra people magazine
  • Home
  • POLITICS
  • GENERAL
  • CRIME
  • ANAMBRA TV
  • EDUCATION
  • BUSINESS
  • ENTERTAINMENT
  • EVENTS
  • ANAMBRA @30
  • DIASPORA
  • Sports
No Result
View All Result
  • Home
  • POLITICS
  • GENERAL
  • CRIME
  • ANAMBRA TV
  • EDUCATION
  • BUSINESS
  • ENTERTAINMENT
  • EVENTS
  • ANAMBRA @30
  • DIASPORA
  • Sports
No Result
View All Result
Anambra people magazine
No Result
View All Result
Home GENERAL

Doubts over use of Second Niger Bridge for yuletide

Toni by Toni
November 22, 2022
in GENERAL
Doubts over use of Second Niger Bridge for yuletide
Share on FacebookShare on TwitterShare on Whatsapp

Despite the completion of the Second Niger Bridge connecting Onitsha, Anambra State in the Southeast and Asaba, Delta State in the South-South, there are indications that travellers and commuters would not be able to use the bridge before December as the access road at the Asaba end is yet to be constructed, ANAMBRA PEOPLE reports.

For those who had expected to ply the road to connect the ever-busy commercial city of Onitsha during the Christmas and New Year celebrations, that hope is dashed, at least for now, as they still would have to contend with the perennial traffic snarl, which is worse during the Yuletide.

The (First) Niger Bridge, constructed over 60 years ago, has become too narrow for the volume of traffic from Asaba to Onitsha and vice versa. Close to Christmas every year, many passengers and motorists are forced to sleep on the road inward Onitsha due to bottleneck on the bridge, compounded by indiscipline on the part of motorists, especially commercial drivers.

Though the access road/Onitsha-Owerri interchange is virtually completed, the bridge, for now, remains closed to traffic, except vehicles belonging to the contractor, Julius Berger Plc, which conveys workers from one end to the other as they put finishing touches on the long-awaited road.

RelatedPosts

US-Based Medical Doctor Who Gave UI $1 Million, Launches Food Outreach in Anambra .

Group Pays #4m Hospital Bill Of Cancer Survivors In Anambra

Sparkles Tent CEO Converge Billionaires at Daughter’s Traditional Marriage in Onitsha.

When contacted to know when the bridge would be formally open to the public, the acting Controller of Works, Federal Ministry of Works and Housing, who is the resident engineer for the project, Oluwaseyi Martins, referred newsmen to the Abuja head office of the ministry. In Abuja, the enquiry was acknowledged, with a response being awaited.

Apart from the fact that the bridge has not been commissioned/inaugurated by President Muhammadu Buhari, as was expected even before now, it was gathered that funds for the second phase of the legacy project, which includes construction of the access road from close to around Asaba Airport in Delta State by Julius Berger Plc, have not been released and is not likely to be released before the end of the year.

More so, with the general elections around the corner attracting the most attention, it was not certain when funds would be released for the project to be completed and open to the public.

The other alternative, reconstruction of the narrow road at Oko, just before the old bridge inward Onitsha, which is narrow and with sharp bends, has not commenced. It is dangerous, as it is, to use the road, considering the volume and size of vehicles expected to ply it as a by-pass.

In March this year, the then Director in the Federal Ministry of Works and Housing and representative engineer for the bridge, Adeyemo Akanji, now retired, stated that the bridge was 91 per cent complete and the entire project about 83 per cent complete, including the roads and bridges.

He added: “On completion of the bridge, because it is not a stand-alone bridge, the ministry is thinking of doing a temporary connection via an access road around Oko in Delta State, just before the old bridge, to put it to immediate use, linking not just Onitsha, but also Owerri.”

During a visit to that road recently, engineers from Julius Berger were seen on ground undertaking mapping of the route and possibly how to align it. But it is uncertain if work on the road would start anytime soon, especially as most construction companies close operations for the year around middle of December.

At the peak of the flooding that ravaged parts of the Southeast and South-South, the road was impassable, as about 90 per cent of it was overtaken by flood on both sides for few weeks.

Some staff of the construction company, who did not want their names mentioned, confirmed it was unlikely that the bridge would be used this season, even though it has been completed, because the access road was yet to be constructed.

It was gathered that the contractor disengaged over 100 casual workers about two months ago as it scaled down work due to non-release of funds for construction of the access road in Delta State end.

Minister of Works and Housing, Mr. Babatunde Fashola, had during a press briefing in September, announced the completion of the bridge, but he was silent on when it would be inaugurated. He had stated: “Our priority is to open the Second Niger Bridge to traffic by December, so that those travelling for the season will do so at ease.”

“The link roads at the Onitsha axis of the bridge have also been completed. Where we are having issues is the link roads at the Asaba axis of the bridge. We are currently sorting issues relating to payment of compensation to affected communities, but, as I speak, engineers are on site working and the sand filling is ongoing.

“We are committed to opening the bridge to traffic by December and I can assure you that, with the level of work done, the set target will be met.”

The Second Niger Bridge was initially billed for completion last February, but was delayed by the COVID-19 lockdown and EndSARS protests, among others.

About Author

Toni

See author's posts

Previous Post

South East youths call for Soludo’s impeachment

Next Post

Former Anambra Education Commissioner, Alice Ndu, Dies at 81

Toni

Toni

Next Post
Former Anambra Education Commissioner, Alice Ndu, Dies at 81

Former Anambra Education Commissioner, Alice Ndu, Dies at 81

Recent News

19-Year-Old Boy Arrested for Kidnapping, Killing Elderly Man After Collecting Ransom in Anambra.

19-Year-Old Boy Arrested for Kidnapping, Killing Elderly Man After Collecting Ransom in Anambra.

June 14, 2025
Peter Obi Arrives UK, Commends Air Peace Airline.

Peter Obi Arrives UK, Commends Air Peace Airline.

June 14, 2025
Again, Hoodlums burn police station in Anambra

Police Arrest Child Kidnappers in Anambra.

June 14, 2025
Man Raises Alarm as 25- Year- Old Loses Life Due to Negligence in Anambra Hospital.

Man Raises Alarm as 25- Year- Old Loses Life Due to Negligence in Anambra Hospital.

June 13, 2025

Most Read

No Content Available

Copyright © ANAMBRA PEOPLE MAGAZINE. All rights reserved.

No Result
View All Result
  • Home
  • POLITICS
  • GENERAL
  • CRIME
  • ANAMBRA TV
  • EDUCATION
  • BUSINESS
  • ENTERTAINMENT
  • EVENTS
  • ANAMBRA @30
  • DIASPORA
  • Sports

© wordpress-1211428-4405999.cloudwaysapps.com