• About
  • Advertise
  • Privacy & Policy
  • Contact
Tuesday, July 28, 2026
Anambra people magazine
  • Home
  • POLITICS
  • GENERAL
  • CRIME
  • ANAMBRA TV
  • EDUCATION
  • BUSINESS
  • ENTERTAINMENT
  • EVENTS
  • ANAMBRA @30
  • DIASPORA
  • Sports
No Result
View All Result
  • Home
  • POLITICS
  • GENERAL
  • CRIME
  • ANAMBRA TV
  • EDUCATION
  • BUSINESS
  • ENTERTAINMENT
  • EVENTS
  • ANAMBRA @30
  • DIASPORA
  • Sports
No Result
View All Result
Anambra people magazine
No Result
View All Result
Home POLITICS

Anambra State House Of Assembly Certifies Pace, Quality Of Work On Okpoko Road Projects.

Onyeka by Onyeka
October 28, 2024
in POLITICS
Anambra State House Of Assembly Certifies Pace, Quality Of Work On Okpoko Road Projects.
Share on FacebookShare on TwitterShare on Whatsapp

By Ndife David, Awka.

Anambra State House of Assembly has expressed satisfaction with the quality of road construction work at Nwokedi and Edmund Street and urge the contractor to ensure speedy delivery of the project.

The Anambra House Committee Chairman on Works and Infrastructure, Hon Emmanuel Nwafor, made the commendation in company of other members of the committee during an inspection tour of ongoing road construction projects in Okpoko.

The Nwokedi and Edmund Street road projects when completed is expected to extend to 1,2, 3 and 4 in Okpoko, Ogbaru Local Government Area of Anambra State.

Speaking shortly after the inspection, the Committee Chairman and member representing Orumba South Constituency in the State House of Assembly, Hon. Emma Nwafor while stating the aim of the visit to assess the progress of work and ensure strict compliance of contractors to project’s specifications.

RelatedPosts

Soludo’s friends honour gov, wife with free fibroid surgeries

Jubilation as 2 Nigerian students secure top-10 global rankings at world’s toughest mathematics Olympiad

Philips State Index: LP candidate hails Otti, says Abia setting standard in S’east

Fadaella Biscuits

He expressed satisfaction with the quality and standard of materials used, especially in the construction of the drainage system, which plays essential role in the effective management of floodwaters in the area and affirmed that upon completion, the road will effectively contain flood-related issues in the area.

Hon. Nwafor further extolled Soludo for providing lasting solution and relief to the community on flood-related stress and charge the people to take ownership of the project by conducting individual inspection to spur the contractors to deliver swiftly.

For the Project Manager, Akaeze Constructions Nig. Ltd, Engineer Austin Ezeadi, the 3.5 kilometer road which is currently at the desilting and drainage structure casting stage will be completed in less than five months and noted that the drainage work will effectively combat flooding menace in the area.

He highlighted several challenges affecting the pace of completing the project, including the after effects of heavy rainfall and uncontrollable discharge of domestic wastewater from residential buildings into the major drain under construction and assured that the challenges are under control.

Engineer Ezeadi further assured delivering the project in time and according to standard.

About Author

Onyeka

See author's posts

Previous Post

Ensure upgrade of prepaid meters before Nov 24 – EEDC urges customers

Next Post

Insecurity: Make Laws For Good Governance – Mayor Urges NASS Members.

Onyeka

Onyeka

Next Post
Insecurity: Make Laws For Good Governance – Mayor Urges NASS Members.

Insecurity: Make Laws For Good Governance - Mayor Urges NASS Members.

Recent News

UNIZIK VC Anyaehie: When education meets vision

UNIZIK VC Anyaehie: When education meets vision

July 27, 2026
None of our students died in Anambra building collapse – Fed Poly Oko

None of our students died in Anambra building collapse – Fed Poly Oko

July 27, 2026
Soludo’s friends honour gov, wife with free fibroid surgeries

Soludo’s friends honour gov, wife with free fibroid surgeries

July 27, 2026
NSCDC arrests suspect for assault, impounds truck with 45000 liters of adulterated PMS

NSCDC arrests suspect for assault, impounds truck with 45000 liters of adulterated PMS

July 27, 2026

Most Read

No Content Available

Copyright © ANAMBRA PEOPLE MAGAZINE. All rights reserved.

No Result
View All Result
  • Home
  • POLITICS
  • GENERAL
  • CRIME
  • ANAMBRA TV
  • EDUCATION
  • BUSINESS
  • ENTERTAINMENT
  • EVENTS
  • ANAMBRA @30
  • DIASPORA
  • Sports

© wordpress-1211428-4405999.cloudwaysapps.com