• About
  • Advertise
  • Privacy & Policy
  • Contact
Friday, September 4, 2026
Anambra people magazine
  • Home
  • POLITICS
  • GENERAL
  • CRIME
  • ANAMBRA TV
  • EDUCATION
  • BUSINESS
  • ENTERTAINMENT
  • EVENTS
  • ANAMBRA @30
  • DIASPORA
  • Sports
No Result
View All Result
  • Home
  • POLITICS
  • GENERAL
  • CRIME
  • ANAMBRA TV
  • EDUCATION
  • BUSINESS
  • ENTERTAINMENT
  • EVENTS
  • ANAMBRA @30
  • DIASPORA
  • Sports
No Result
View All Result
Anambra people magazine
No Result
View All Result
Home POLITICS

First Niger Bridge Closed for Two Weeks 

Onyeka by Onyeka
September 4, 2026
in POLITICS
Share on FacebookShare on TwitterShare on Whatsapp

The Federal Ministry of Works, Anambra State Field Headquarters, has officially announced the closure of the First Niger Bridge in Onitsha to commence repair works.

 

 

The closure comes after last week’s visit by the Minister of Works, Dave Umahi, who inspected a vandalised section of the bridge, where bolts and iron rods had been stolen by scavengers.

 

RelatedPosts

Thousands to be empowered in Anambra during visit by Nigeria’s First Lady

‎Ezeajughi: The Quiet Architect Of Soludo’s First-Term Transformation – A Legacy Of Service, Character And Results

60th birthday: Anambra Billionaire, Uzochukwu hails Shettima’s national service, detribalised friendship

An official press release by the ministry’s field office in Anambra, signed by the State Controller, Mr Timothy Emenike, noted that the bridge would be closed for two weeks, starting Monday, 7 September 2026.

 

During his recent working visit to Anambra State, the Minister of Works, David Nweze Umahi, expressed concern over the condition of the bridge and directed the immediate commencement of emergency maintenance and rehabilitation works to restore the facility to a safe and properly motorable condition.

 

Accordingly, Messrs SKECC, the contractor handling the Km 0+000 to Km 20+000 section of the Onitsha-Enugu Dual Carriageway, has been directed to immediately commence emergency maintenance works on the First Niger Bridge.

 

“The First Niger Bridge will be fully closed to traffic from Monday, 7” September 2026, and the emergency maintenance works are expected to be completed by Monday, 21st September 2026. In view of the nature and urgency of the intervention, motorists and other road users are hereby advised and directed to use the Second Niger Bridge route through Obosi towards Asaba, Delta State and other destinations beyond, throughout the closure period.

 

“Appropriate traffic diversion arrangements, road signs, safety barriers, traffic-control personnel and other necessary safety measures will be deployed to guide motorists and ensure the safety of road users, construction personnel and other members of the public.

 

 

“Motorists are strongly advised to obey all temporary traffic signs and diversion instructions, approach the construction and diversion zones with caution, reduce speed and avoid reckless overtaking.”

 

The ministry said part of the work to be done on the bridge includes milling and removal of the existing deteriorated asphalt surfacing, laying of approximately 40mm asphalt wearing course and necessary associated maintenance and safety works on the bridge.

 

Also, the maintenance will include the installation of solar-powered streetlights and closed-circuit television, CCTV, cameras to monitor the activities of vandals on the bridge, installation and deployment of appropriate traffic-control and diversion measures with the objective to ensure safety, smooth driving and significantly reduce the traffic difficulties currently experienced around the First Niger Bridge axis.

 

The ministry said the work will be done day and night to ensure speed. It apologised for the inconvenience the closure will cause businesses and road users, promising to strengthen the integrity of the bridge for the safety of all.

 

About Author

Onyeka

See author's posts

Previous Post

Thousands to be empowered in Anambra during visit by Nigeria’s First Lady

Onyeka

Onyeka

Recent News

First Niger Bridge Closed for Two Weeks 

September 4, 2026
Thousands to be empowered in Anambra during visit by Nigeria’s First Lady

Thousands to be empowered in Anambra during visit by Nigeria’s First Lady

September 4, 2026
NUJ Anambra State Council 2026 Press Week Begins

NUJ Anambra State Council 2026 Press Week Begins

September 4, 2026
Suspected motorcycle snatchers lose bag of ammunition while fleeing police arrest

Suspected motorcycle snatchers lose bag of ammunition while fleeing police arrest

September 4, 2026

Most Read

No Content Available

Copyright © ANAMBRA PEOPLE MAGAZINE. All rights reserved.

No Result
View All Result
  • Home
  • POLITICS
  • GENERAL
  • CRIME
  • ANAMBRA TV
  • EDUCATION
  • BUSINESS
  • ENTERTAINMENT
  • EVENTS
  • ANAMBRA @30
  • DIASPORA
  • Sports

© wordpress-1211428-4405999.cloudwaysapps.com